
| | | 
|
| | |  |
| | | | | | | | | | | | | | |
Projects | | | Clinton River Trail Master Plan |
| | |
| | | | | | | | | | | | | | |
 | | overview | | | | | | | |
| | | | | | | | | | | | | |
| | The Clinton River Trail is a proposed multi-use path that travels nearly 16-miles through the eastern half of Oakland County, Michigan. The trail roughly parallels and frequently crosses the Clinton River. While primarily located on an abandoned railroad grade, the proposed path includes a portion over four miles long that circumnavigates a gap in railroad corridor ownership. The surrounding landscape includes downtowns, industry, residential areas, parks, and some sites likely to see development in the near future. The two most significant challenges of the project were designing the 18 major road crossings and determining the best way to circumnavigate the gap in ownership in Pontiac. | |
| | | | | | | | | | | | | |
| DOWNLOADS | | | | |
| | | | | | | | | | | | | |
| | These are PDF files. For best results, right click on link, select "Save Target As" and specify where you would like to save the file on your computer. | | |
| | | | | | | | | | | | | |
| | | Clinton River Trail Final Master Plan 3.7 MB Clinton River Trail Final Map 2.1 MB
|
| | | | | | | | | | | | | | |
| project information | | | | | |
| | | | | | | | | | | | | |
| | Client: | | | | Michigan Trails and Greenways Alliance 410 South Cedar, Suite A Lansing, MI 48912 517-485-6022 Fax: 517-485-9181 | | | |
| | | | | | | | | | | | | |
| | Contact: | | Nancy Krupiarz, Director | | |
| | | | | | | | | | | | | |
| dates: | | | 2002 - Present | | |
| | | | | | | | | | | | | | |
| | The Greenway Collaborative, Inc. 214 Nickels Arcade Ann Arbor, MI 48104-1911 Phone: 734-668-8848 Fax: 734-668-8820 
|
| | | | | | |
| | Copyright © 2003 The Greenway Collaborative, Inc. Last modified: December 06, 2007 | | | | | | |