HOME  PROJECTS  CLIENTS  STAFF  LINKS  SEARCH

Projects

 

St. Clair County Nonmotorized Guidelines

   

 

overview

The goal of the St. Clair County Nonmotorized Guidelines is to develop an approach to accommodating bicycling, walking and other nonmotorized modes of travel on and across MDOT’s trunkline system in St. Clair County.  While the focus is on MDOT ’s system in St. Clair County, this document has been prepared with the consideration that it may be utilized by other MDOT offices as well as county and local road agencies throughout the state.

 

Downloads

The September 30, 2005 Report is available for downloading.  The document is in two files.  The first is the main report.  The second is a 30" x 40" inventory of existing and proposed nonmotorized facilities.  These are PDF files.  For best results, right click on link, select "Save Target As" and specify where you would like to save the file on your computer.

 

St. Clair County Nonmotorized Guidelines Report  a 5.4 MB PDF file

 

St. Clair County Nonmotorized Guidelines Map  a 1.3 MB PDF file

 

 

project oversight committee composition

The composition of the Project Oversight Committee includes representatives of the state transportation agency, local government departments, local advisory committees, affected public agencies, and the general citizenry. 

  • Michigan Department of Transportation:

    • Todd Kauffman , MDOT Project Manager

    • Deb Alfonso, Supervisor, Intermodal Services Unit

    • Greg Johnson, Region Engineer, Metro Region

    • Jeff Edwards, Transportation Planner, Metro Region

    • Larry Young, Manager, Port Huron Transportation Service Center

    • Mohammad Huque, Design Engineer, Port Huron Transportation Service Center

  • SEMCOG –  Alex Bourgeau, Transportation Programs

  • US Dept of Transportation, Federal Highway Administration – David A. Morena, Safety & Traffic Operations Engineer

  • St. Clair County Parks & Recreation Commission – Mark A. Brochu, Director

  • County of St. Clair Metropolitan Planning Commission – Douglas Plachcinski, Transportation Planner

  • County of St. Clair Road Commission, Dept of Public Works – James R. Warner, Director of Engineering

  • League of Michigan Bicyclists

  • China Township Representative – Scott Anderson, Citizen

  • Horseback Riding Representative – Amy Balon

project team

Michigan Department of Transportation – Lead Organization

  • Todd Kauffman – Project Manager

The Greenway Collaborative, Inc. – Prime Consultant and lead planner responsible for about 66% of the project.

  • Norman Cox, ASLA, President

Midwestern Consulting, LLC – Civil Engineering sub-consultant responsible for about 33% of the project.

  • Karl Kleitsch, PE, Associate, Transportation Engineer

 

project information

 

Client:

Michigan Department of Transportation

Van Wagoner Building
425 West Ottawa Street
PO Box 30050 
Lansing, MI 48909

(517) 335-2918  Fax: (517) 373-9255

 

Contact:  Todd Kauffman

 

dates:  2004 - 2005

 


The Greenway Collaborative, Inc.

214 Nickels Arcade

Ann Arbor, MI  48104-1911

Phone: 734-668-8848  Fax: 734-668-8820


Copyright © 2003 The Greenway Collaborative, Inc.
Last modified: February 07, 2006